Our Packages
INCLUDES:
Site analysis & basic architecture
Civil construction & finishing
Standard plumbing & electrical
Quality checks at key stages
Estimated Timeline: 3–6 Months
INCLUDES:
Structural + MEP design integration
RCC framework, glass façade
HVAC, fire safety & access systems
Project reporting & site supervision
Estimated Timeline: 6–9 Months
INCLUDES:
Site preparation & excavation
Steel or RCC structural framework
Foundation for heavy loads
Power, water & drainage setup
Floor finishing & utility zones
INCLUDES:
Detailed project report (DPR)
Soil test & topographic survey
Cost estimation & BOQ
Engineering & municipal approvals
Multi-vendor coordination
INCLUDES:
Energy-efficient design & planning
Solar panel & rainwater harvesting setup
Thermal insulation & eco-materials
Green certifications & compliance
Estimated Timeline: 6–9 Months
INCLUDES:
High-end architectural design
Imported materials & finishes
Smart home automation setup
Custom landscaping & exterior works
Estimated Timeline: 8–12 Months